16-06-2018 Living; half the sheet of Fermacell behind the ventilation pipes was fitted and stapled16-06-2018 Landing; the insulation is fitted in the ceiling of the Landing16-06-2018 Landing; three sheets of Fermacell are in the ceiling16-06-2018 Landing ; the walls and ceiling are “filled and smoothed”16-06-2018 Kitchen; the last sheet of Fermacell needs to go pn the wall16-06-2018 Kitchen; the last sheet of Fermacell is stapled in on the Kitchen wall16-06-2018 Cloak; the box is “filled and smoothed”16-06-2018 Stairs; the walls and ceiling are “filled and smoothed”16-06-2018 Landing; the ceiling is “filled and smoothed”